Edit Module Edit Module

Article Archive

Archive of: Construction

Title Issue
Biggest Hospital Contract in Maine

Biggest Hospital Contract in Maine

Feature Project 2013

September 2013
$62 million Stadium Delivered for Kickoff in 20 Months

$62 million Stadium Delivered for Kickoff in 20 Months

Feature Project 2013

September 2013
Navy Hospital for the Pacific Rim

Navy Hospital for the Pacific Rim

Feature Project 2013

September 2013
Building Tools Redesigned

Building Tools Redesigned

At Auburn’s Studio Build, 20-somethings are designing and patenting tools of the future — including a robot that blueprints freshly poured floors and ceilings, mapping walls, vents and plumbing.

March 2013
Hard Hat Higher Ed

Hard Hat Higher Ed

Construction managers these days are less likely to rise from the trades. Auburn University’s Field Lab takes student hands from the desktop to the concrete.

March 2013
Building Back Better

Building Back Better

These five Alabama communities, in various stages of recovery, share a common determination: to build back better than ever.

March 2013
Drilling for Liquid Gold. Water, That Is.

Drilling for Liquid Gold. Water, That Is.

A tornado crisis at Tuscaloosa’s largest hospital led Tuscaloosa-based geo-specialist PELA to do what it’s been doing all around the world, beginning over 50 years ago — drilling deep for water solutions.

March 2013
Standout Projects: Flagship Reconstruction

Standout Projects: Flagship Reconstruction

September 2012
Standout Projects: Top-in-Hemisphere Green Merits

Standout Projects: Top-in-Hemisphere Green Merits

September 2012
Standout Projects: Polishing the Mobile Skyline

Standout Projects: Polishing the Mobile Skyline

September 2012